Riverbed remediation Essche Stroom
At Essche Stroom, Kurstjens demonstrated what a truly integrated approach looks like. Commissioned by Waterschap De Dommel, 120,000 m³ of heavily chromium-contaminated dredged material was processed efficiently and sustainably – using only in-house equipment and expertise.
By combining cutter suction dredgers, direct on-site sediment treatment (in-water), and mobile sludge dewatering, the entire process was integrated into one smart, closed-loop system.
The cleaned sand fraction was immediately reused within the watercourse, while the contaminated sludge fraction was dewatered into a solid cake for controlled disposal.
Results:
Maximum efficiency without unnecessary transport
Preservation of watercourse stability through immediate reuse of cleaned sand
Significant volume reduction through effective sludge dewatering
Year-round execution with respect for flora and fauna
Safe operations in accordance with BRL-OCE, including in UXO-risk areas
This project highlights what Kurstjens stands for:
technically advanced solutions, executed fully in-house, with maximum control over quality, planning, and results.